top of page

Palisades Resort Funitel

JKAE has continuously provided civil, structural, and architectural services to Palisades since 1995.

We have been responsible for the CEQA processing and civil design for projects such as: the Funitel lift upper and lower terminals, the Gold Coast lift replacement, the Headwall lift replacement, the Shirley Lake lift replacement, tower 4 detention basin, Riviera Superpipe design, and currently the replacement of the Granite Chief, Links, High Camp, and Red Dog lifts. We have also provided structural engineering for: the snowboard shop remodel, the snow making pump station, the upper and lower Funitel terminals and tower foundations, the current remodel of the ticket portal, the current remodel of the Gold Coast building, the Squaw Creek bridge replacement, and the lower Headwall terminal bridge. Our planning services include: the parking master plan, Olympic Plaza loading dock, Easy Street ski run, Olympic High ski run, and assistance on numerous Lahontan Water Quality Control Board issues.

LOCATION

Olympic Valley, CA

bottom of page