Reno Waste Management

The Reno Waste Management facility was a multiple-phase project consisting of building and site improvements to the existing facility.

JKAE performed civil engineering services and construction administration for proposed improvements to the existing Waste Management transfer station and collection facility located in Reno, NV. These improvements included the construction of an approximately 40,000 sf Material Recovery Facility (MRF) and an attached two-story administration building, as well as the construction of an approximate 2.5 acre paved employee parking area and scale house plaza. The project also included the construction of a new ticket booth, ADA restrooms, and a truck wash canopy. Additionally, this project included over 870 linear feet of public road frontage and drainage improvements along Commercial Row, utility design, stormwater management and BMPs, asphalt and concrete paving. JKAE took the lead in obtaining site permits from the City of Reno and the Truckee Meadows Water Authority.

LOCATION

Reno, NV

SIZE

40,000 SF

IMAGINE  |  DESIGN  |  CREATE

FOLLOW US

  • Facebook
  • Instagram
  • LinkedIn
  • YouTube